Guide / Fundraising

How Much Pre Seed Funding Should You Raise? Build a Milestone Cash Range

Size a pre-seed raise by calculating the cash required to reach a defined business milestone, protect a chosen operating reserve, and cover financing costs, after subtracting resources already available. Build a range from explicit operating scenarios. A typical round reported elsewhere cannot answer what this company needs.

The fundraising readiness guide addresses whether capital belongs in the business now. The use-of-funds framework explains what capital should accomplish. This guide addresses the amount: how to derive it, reconcile the cash, and decide which plan a smaller or larger raise would actually support.

The SEC's Ready to Raise CAPITAL resource connects the requested amount to projected expenses and a plan for proceeds. The model below is an original planning example, not a financing recommendation or a substitute for company-specific finance and legal advice.

Choose the milestone before choosing the amount

Define an observable state that would make a future operating decision better. Completing a technical validation, testing whether customers adopt without extensive founder work, or establishing a repeatable purchase process are different milestones. They imply different teams, spending, and timing.

“Eighteen months of runway” states a period, not what the business should accomplish. “Hire engineers and grow” states inputs. Write what should become known or possible, which evidence would demonstrate it, and what happens if the evidence is unfavorable.

List the work needed to reach that state. Identify tasks that must happen before others can begin. A product capability may precede customer evaluation; an evaluation may precede a buying decision. Increasing spending does not necessarily compress those dependencies.

Then define the end of the funding period. Does the model stop at the milestone, include time to review the result, or support a further operating decision? Make the boundary visible. Do not silently assume that achieving the milestone guarantees another financing.

Build the cash bridge

For each period, show opening cash, cash collections, operating payments, one-time payments, financing cash received, and closing cash. Payroll and other costs should reflect when cash leaves. Revenue recognition, signed contracts, and customer payment timing are separate inputs.

Use this planning identity across the full horizon:

Required new cash = operating cash payments − cash collections + one-time payments + financing costs + desired ending cash − available opening cash.

This assumes the categories are complete, correctly timed, and counted once. A separate monthly schedule must check that cash does not fall below the operating floor before the end. An ending-balance formula alone can hide an earlier shortfall.

Exclude uncommitted investor interest from opening cash. Treat restricted funds according to their actual availability. Model credits as relief against eligible expenses rather than a second cash balance. The monthly runway template provides the wider cash structure.

A hypothetical twelve-month plan

Imagine a fictional software company testing whether a defined buyer group can adopt its product with less founder intervention. All figures below are invented for the model. They are not market rates, company results, or recommended reserve amounts.

The company has $110,000 of available opening cash. Its base plan has operating payments of $40,000 monthly for six months, then $55,000 monthly for six months. Expected collections are $5,000 monthly for the first six months and $10,000 monthly for the next six.

Cash componentCalculationBase-plan amount
Operating payments6 × $40,000 + 6 × $55,000$570,000
Customer collections6 × $5,000 + 6 × $10,000$90,000
Net operating cash use$570,000 − $90,000$480,000
One-time implementation costsSeparate from operating payments$30,000
Financing costsSeparate planning assumption$20,000
Desired ending cashChosen operating reserve$90,000
Available opening cashVerified starting resource$110,000
Required new cash$480,000 + $30,000 + $20,000 + $90,000 − $110,000$510,000

The bridge reconciles: $110,000 opening cash plus $510,000 financing plus $90,000 collections, less $570,000 operating payments, $30,000 one-time costs, and $20,000 financing costs, leaves $90,000.

That calculation assumes the financing arrives when modeled. It does not prove the company can wait indefinitely for it. Put the actual expected receipt date into the monthly cash view and test delays.

Create alternatives that mean something

A range should correspond to different assumptions, rather than a low number and a high number chosen because they sound plausible.

In the hypothetical downside plan, the same work takes fifteen months. The first six months still cost $40,000 each; the following nine cost $55,000 each. Collections remain at $5,000 monthly throughout. One-time costs, financing costs, and the desired reserve remain unchanged.

Operating payments become $735,000. Collections become $75,000. Net operating cash use is $660,000. Required new cash is therefore $660,000 + $30,000 + $20,000 + $90,000 − $110,000 = $690,000.

The difference from the base case is $180,000. It comes from three extra months of operating payments and lower collections than the base plan, not from an unexplained contingency percentage.

A smaller raise needs a different plan if it cannot fund the original one. For example, a ten-month, reduced-scope test at $40,000 monthly with $5,000 monthly collections uses $350,000 net operating cash. Add $20,000 setup costs, $20,000 financing costs, and a $70,000 ending reserve; subtract $110,000 opening cash. That narrower plan requires $350,000. Its outcome must also be narrower. It cannot be described as the same proof for less money merely because the table is attractive.

Test what actually drives the range

Identify the few assumptions that most affect cash and milestone timing. Common candidates include hiring start dates, time to complete a technical dependency, customer collections, and the manual work needed per deployment. Investigate the inputs that change the decision most.

Avoid double counting a downside. If slower progress already extends the operating period, adding a separate buffer for the identical delay can inflate the plan without explaining what the additional money protects. A reserve can still be appropriate; define its purpose separately.

Likewise, do not force every expense to scale with revenue. A product team or contractual payment may remain even when collections disappoint. A credible conservative case reflects the actual ability to change commitments.

Compare capital requirements with financing consequences

Keep gross financing and usable proceeds consistent

The amount negotiated and the cash available for operations can differ when transaction costs or other agreed payments apply. Confirm the treatment with finance and counsel rather than switching between gross and net figures inside the model.

For example, imagine a separate hypothetical $500,000 financing with $20,000 of transaction costs. A gross presentation shows $500,000 financing cash and $20,000 costs, leaving $480,000 before other movements. A net-proceeds presentation starts with $480,000 and must not deduct those same costs again. Either can explain the economics if the actual payment sequence is reconciled; mixing them understates cash by $20,000.

Also check whether the expense plan contains the full cash cost of the work. A salary assumption that omits employment costs or a vendor price that excludes required implementation can make the raise appear sufficient while leaving obligations outside the model. These are company-specific inputs to verify, not a reason to apply an invented universal overhead percentage.

Maintain a short excluded-cost list during preparation. Resolve each material item into the model, a separate scenario, or an explicit scope decision before presenting a funding requirement. This is particularly useful when product, finance, and the founders supplied different parts of the budget.

The cash model explains need. It does not decide whether investors will provide the amount, whether the terms are acceptable, or whether the business should pursue external financing at all.

Review ownership and instrument scenarios with qualified counsel. More money can create more capacity and more obligations. Less money can preserve flexibility while leaving a milestone underfunded. A staged close or conditional tranche introduces its own timing and legal questions; the operating plan should not treat contingent capital as received.

Discuss what happens if the company receives only part of the target. Which work starts, which commitments wait, and what is the minimum viable plan? Decide this before a partial amount creates pressure to begin spending as though the full round arrived.

Write the raise decision in one page

Record the milestone, funding horizon, available cash date, monthly cash source, base requirement, downside requirement, reduced-scope alternative, reserve rationale, and costs excluded from the calculation. Name the assumptions that would cause a revision.

Then connect the amount to a fundraising timeline. The cash must arrive early enough to support the work and existing obligations. A mathematically sufficient round arriving after a payroll shortfall does not solve the same problem.

The right output is a defensible cash range with explicit choices behind it. You should be able to explain what each amount buys, what it leaves uncertain, and how the company would operate if the funding or customer timeline changes.

Co-founder and CEO of Stackmatix, startup advisor, and former Head of Sales at MightyHive. · More about Matt →