Playbook / Company building

Run a Technical Feasibility Spike Before Promising the Pilot

Run a technical feasibility spike when a commercial promise depends on a capability you have not demonstrated under the conditions that matter. Isolate the uncertain mechanism, set a resource limit, test representative difficult cases, and decide what you can honestly promise afterward.

A spike is a bounded investigation, not a miniature product launch. Its useful output is evidence and a decision. Code may be disposable. A polished interface is optional. An unsupported commitment to a buyer is not.

Use the concierge MVP playbook when the question is whether a manually delivered outcome matters to customers. A human producing an excellent result does not answer whether the proposed technology can do the work reliably or economically.

What is the single engineering uncertainty?

Write the capability, input conditions, output requirement, and costly failure. Avoid a broad task such as build the AI prototype. That can consume a week while leaving the original risk untouched.

For a hypothetical invoice-extraction startup, a specific question might be whether the system can identify the supplier, amount, and due date from the document types a prospective customer actually uses, while flagging ambiguity rather than silently creating an incorrect payable.

Those are separate requirements. Finding a field, interpreting it correctly, handling a missing field, and refusing an unsupported result are not interchangeable successes.

NASA's systems engineering handbook appendix, checked November 18, 2026, describes technology maturity through demonstrated performance and distinguishes relevant testing environments. The useful principle here is evidence tied to conditions. This startup template is not a NASA readiness assessment or certification.

Define the promise boundary before designing the test

Write what sales wants to promise and what the current evidence supports. The gap determines the investigation.

Proposed promiseEvidence questionPossible narrower commitment
Process every invoice automaticallyWhich formats and exceptions are represented?Extract draft fields from supported formats for review
No human review neededCan costly errors be detected before an action?Require approval before creating a payable
Connect to the buyer's finance systemAre access, schema, and permissions tested?Export a reviewed file during a bounded evaluation
Deliver next weekAre external dependencies available?Agree a readiness checkpoint before a delivery date

Do not describe a narrower commitment as merely legal caution. It changes what the product must do, the customer's work, and the economics of the offer. The product-limits guide helps make those boundaries visible rather than hiding them in a late-stage conversation.

Build a test that can invalidate the plan

Use permitted inputs and retain their relevant difficulty. Include ordinary examples, missing information, conflicting fields, low-quality inputs, and known failure cases where appropriate. Record which important conditions you could not obtain.

Separate development examples from held-out evaluation cases. If the team tunes against every example, the final result may say more about memorizing the test than handling another customer's work.

Name the baseline. It could be the current manual process or a simpler technical approach. Compare result quality, review effort, processing cost, and failure recovery. A more sophisticated system is not automatically a better choice.

The workflow-evaluation rubric provides a reusable quality record. For this spike, narrow that rubric to the specific go/no-go question rather than expanding into an indefinite evaluation program.

Work through a fictional 60-document spike

Every figure in this example is hypothetical, not a benchmark or a client result. Suppose the team assembles 60 authorized documents: 30 ordinary digital invoices, 20 scans, and 10 deliberately difficult cases with missing or conflicting fields.

The team defines a safe complete outcome as either correct draft fields or an explicit referral to human review when the required fields cannot be established. An unflagged wrong amount is a serious failure, even if the rest of the document looks correct.

GroupCasesCorrect draftExplicit review referralUnflagged material error
Digital invoices302820
Scans201541
Difficult cases10262
Total6045123

The output contains 45 correct drafts, 12 review referrals, and three unflagged material errors. The rows reconcile to 60. Calling the system 95% successful because only three cases failed would obscure the cost and type of failure. Calling 45 of 60 correct drafts a 75% unattended completion rate would also be wrong if the intended workflow still requires approval.

Assume reviewing the 45 drafts takes one minute each, the 12 referrals take five minutes each, and investigating the three errors takes ten minutes each. The observed review and investigation effort is 45 + 60 + 30 = 135 minutes, before setup and other work. That is an illustrative workload calculation, not a deployment forecast.

The result does not support autonomous creation of payables. It may justify another test of scan handling, or a narrower digital-invoice drafting workflow with mandatory review. The decision should state that distinction directly.

Time-box learning, not just coding

Suppose the founders cap the spike at 40 hours: eight to define and prepare permitted cases, 16 to implement alternatives, eight to evaluate, and eight to interpret failures and write the decision. These chosen limits total 40 hours. They are not a universal engineering estimate.

If suitable inputs or access never arrive, the spike is blocked, not passed. If the initial implementation consumes the whole budget, reduce scope or stop rather than quietly eliminating evaluation.

The experiment brief is useful for linking that resource commitment to a decision. Keep the technical investigator and the commercial promise owner aligned about what each possible result permits.

Finish with a go, narrow, investigate, or stop report

Record the tested configuration, cases, exclusions, baseline, results, serious failures, review effort, cost assumptions, and remaining dependencies. Link the evidence so another qualified person can inspect the reasoning.

Then choose one action: build toward a bounded pilot, narrow the promise, investigate a named failure, or stop this technical route. Assign an owner and a deadline for the next commitment.

Do not let a successful spike become production software by accident. Security, privacy, reliability, integration, support, and appropriate professional review may still be necessary. A spike retires a specified uncertainty. Its value is knowing which promise the evidence earns, and which promise it does not.

Co-founder and CEO of Stackmatix, startup advisor, and former Head of Sales at MightyHive. · More about Matt →